Harris Lake work day with Andy and Crew.

Andy and his merry band of 9 trail volunteers worked on the one major spot at the beginning of the Intermediate loop. This spot was flat and had been holding water due to the high lake levels. They raked out the old muck, put down/tamped a rock base and then covered with crush-and-run in an effort to raise the trail a few inches.

Andy said after the work day, “A big thanks to everyone. Man we worked hard and moved a ton of materials. It worked! They were opening up the trails as I left.”

Here are a few pictures:

1 3 4 52